Our task was to complete documentation in the areas of heavy current, weak current and MaR.
At the address Wenceslas Square 47 a house with 9 above-ground and 3 underground floors was built, with a total of about 26,000 m2 of floor space, the house was approved in June 2020. The originally planned name ‘Flower building’ replaced the name ‘Flow building’, referring to the fact that it better describes ‘the spirit of the continuous cycle of the city, its flow.“
Underground there are two floors of garages with 129 parking spaces. There are over 50 chargers for electric cars. The lower three floors are designed for business, the rest are offices, on the upper floors there is a large terrace with a unique view of the whole of Prague.
The investor in the building is Flow East, which also owns the Jalta Hotel next door. In collaboration with the architectural studio Chapman Taylor created a building that takes on its shape, lamellas surrounding the glass facade and cutting-edge technological equipment.
Building the foundations – concrete pilots – was complicated by the subway tunnels, which at their narrowest point are only ten meters below the lowest level. The interior of the building is equipped with state-of-the-art technologies for automation, and especially for limiting energy consumption and emissions. The cooling and heating system is solved with heat pumps, just a small detail is, for example, an automatic system at the entrance, which directly summons employees to the target floor of the offices.
More info used technology, project name changes
At the birth of the building, in addition to the experts’ discussions on technological procedures, there were many passions for the demolition of the Neo-Renaissance building U Turků.